Flood Inundation Prediction of Logung River due to the Break of Logung Dam

https://doi.org/10.22146/jcef.28109

Listyo Rini Ekaningtyas(1*)

(1) Board of Financial Auditor, Jakarta, Indonesia
(*) Corresponding Author

Abstract


The construction of Logung Dam in Kudus Regency is aimed to reduce the inundation area at downstream of Logung River, particularly during the rainy season. Besides, the potential water of Logung Dam is used for for irrigation and non-irrigation services. In order to mitigate the flood disaster that may arise in the downstream area, various preparedness should be established including the identification of flood hazard characteristics that may be caused by the break of the Logung Dam. This paper presents the results of Logung Dam break analysis using the levee pool routing model and the 2-D channel routing of the HEC-RAS 5.0 Version software. The initial value of breach parameter was calculated using the Froehlich’s equation, and variation of breaking times (1, 2, and 3 hours) were applied to study the generated hydrograph based on the corresponding elevation-storage curve. Furthermore, the simulation of channel routing at downstream of the dam was carried out in three different scenarios based on the bridges condition at downstream of the Logung Dam. Scenario 1 assumed that bridges will be safe enough against flood. Scenario 2 assumed that the bridges would only be safe at flood with return period lower than 20 years, whereas the scenario 3 assumed that bridges would be collapsed due to the flood at design flood with several return periods. The simulation results showed that the Probable Maximum Flood (PMF) with peak discharge of 1,303.60 m3/s did not generate overtopping. The peak discharge through the dam body was 15,022 m3/s at the first 40 minutes. It took 7 hours and 30 minutes to decrease the water level of the reservoir from +95.2 m to +38 m. In scenario 2, the simulation used 20 years return period flood with velocity in cross section before the Bridge RS 3700 was 7.21 m/s and before Bridge RS 6800 was 5.72 m/s. Furthermore, the 2-D simulation results showed that at the near downstream of the Logung Dam, the maximum depth was 55 m and the maximum velocity was 39 m/s. Several prone areas to flood caused by the dam break are the villages at the left side of the downstream Logung River including Bulung Cangkring, Bulung Kulon, Sidomulyo, Pladen and Jekulo village.


Keywords


Logung Dam, dam break simulation, channel routing, flood prone area

Full Text:

PDF


References

Brunner, G., 2014. Using HEC-RAS for Dam Break Studies, Davis: USACE, Institute for Water Resources, Hydrologic Engineering Center.

Chow, et al, 1988. Handbook of Applied Hydrology, Singapore: McGraw Handbook.

Chow, V. T., 1959. Open Channel Hydraulics, New York: Mc Grow Hill Book Company.

Ekaningtyas, L. R., 2017. Flood Inundation as Caused by Dam Break of Logung Dam, Kudus Regency, Central Java Province, Yogyakarta: Master Thesis, Faculty of Engineering, Universitas Gadjah Mada.

Fang, C. H., Chen, J. & Xiao, K., 2016. A New Method to Quantify Breach Sizes for the Flood Risk Management of Concrete Arch Dams. Journal of Flood Risk Management. DOI:10.1111/jfr3.12240

Fread, D., 1980. DAMBRK: The NWS dam-break flood forecasting model, Silver Spring: National Weather Service, Office of Hydrology.

Froehlich, D., 2008. Embankment Dam Breach Parameters and Their Uncertainties. Journal of Hydraulic Engineering, American Society of Civil Engineers, Volume 134, pp. 1708-1721.

Linsley, R., 1982. Hidrologi Untuk Insinyur [Hydrology for Engineer]. 3 ed. Jakarta: Erlangga.

Ndun, J., 2004. Simulasi 1-D Banjir Akibat Keruntuhan Bendungan dengan Program HEC-RAS 4.1.0 Studi Kasus Embung Tambakboyo, Kabupaten Sleman, Provinsi DIY, Yogyakarta: Master Thesis, Faculty of Engineering, Universitas Gadjah Mada.

PT. Ika Adya Perkasa, 2014. Laporan Analisa Hidrologi Sertifikasi Desain Bendungan Logung di Kabupaten Kudus [Analysis of Hydrology for Certification Design of Logung Dam, Kudus Regency]. PT. Ika Adya Perkasa.

Salukh, F. I., 2004. Analisis Penelusuran Banjir Akibat Keruntuhan Bendungan [Analysis of Flood Routing due to Dam Break], Yogyakarta: Master Thesis, Faculty of Engineering, Universitas Gadjah Mada.

Sri Harto, B., 2009. Hidrologi Teori, Masalah, dan Penyelesaian [Hydrology: Theory, Problem, and Solving]. Yogyakarta: Nafiri Offset.

Sujono, J., 2014. Petunjuk Singkat Aplikasi HEC-HMS [Short Guideline of HEC HMS Application], Yogyakarta: Lecture's Note, Department of Civil and Environmental Engineering, Universitas Gadjah Mada.

U.S. Army, 2016. HEC-RAS River Analysis System, User's Manual, Version 5.0. U.S. Corps of Engineers.



DOI: https://doi.org/10.22146/jcef.28109

Article Metrics

Abstract views : 1841 | views : 2993

Refbacks

  • There are currently no refbacks.




Copyright (c) 2022 The Author(s)


The content of this website is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
ISSN 5249-5925 (online) | ISSN 2581-1037 (print)
Jl. Grafika No.2 Kampus UGM, Yogyakarta 55281
Email : jcef.ft@ugm.ac.id
Web Analytics JCEF Stats