Predicting the Required Volume Need for Architectural Work Using Artificial Neural Networks in Hospital Buildings

https://doi.org/10.22146/jcef.39772

Aulia Yudha Prathama(1*)

(1) Audit Board of Indonesia, Central Jakarta, INDONESIA
(*) Corresponding Author

Abstract


Decision-making in construction design has an important role. The need for estimation tools of planning and project management aspects needs to develop. This paper discussed the benefits of artificial neural network methodology to overcome the problem of estimated the needs of the volume of wall paired, ceiling worked pairing, and ceramic floor pairing for architectural work at the designed stage of the building. The average architecture cost of state building is 29%-51% of total construction value. Data from 15 projects was used for being trained and tested by Artificial Neural Network (ANN) methods with 5 design input variables. The ANN helped to estimate the value of volume requirement on the architectural working of Pratama Hospital building project in remote areas of Indonesia. Those input variables include building area, average column span distance, the height of the building, the shape of the building, and a number of inpatient rooms. From ANN simulation, the best empirical equation of P2V5 modeling was used to predict the need of hospital architecture work volume at conceptual stage with best ANN structure 5-9-3 (5 input variables, 1 hidden layer with 9 neurons and 3 output) with result of estimation accuracy a maximum of 96.40% was reached.


Keywords


Artificial Neural Network; building design; conceptual stage; the estimated volume of work; hospital building

Full Text:

PDF


References

Hegazy, T. and A. Ayed., 1998. A Neural Network Model for Parametric Cost Estimation of Highway Projects. Journal of Construction Engineering and Management, ASCE, Vol. 24 No.3, 210-218.

Kesturi, L., 2012. Estimasi Biaya Tahap Konseptual pada Konstruksi Gedung Perkantoran dengan Metode Artificial Neural Network. Jakarta: Tesis. Universitas Indonesia.

Kusumadewi, S., 2004. Membangun Jaringan Saraf Tiruan Menggunakan MATLAB & Excel Link. Yogyakarta: Penerbit Graha Ilmu.

Mohamed A, Celik T. Knowledge Based-System For Alternative Design, Cost Estimating And Scheduling. Knowl Based Syst 2002; 15:177–88.

Rumelhart D., Hinton G. and Williams R., 1986. Learning Internal Representations by Error Propagation. U.S.A: Cambridge: MIT Press.

S.Zeynep. Dogan, 2004. A Neural Network Approach for Early Cost Estimation of Structural System of Buildings www.elsevier.com/locate/ijproman

Saner C., 1993. A Proposal for Cost-Estimation for Structural Systems of 4–8 Storey Residential Buildings. MSc Thesis, Istanbul Technical University



DOI: https://doi.org/10.22146/jcef.39772

Article Metrics

Abstract views : 2185 | views : 2275

Refbacks

  • There are currently no refbacks.




Copyright (c) 2022 The Author(s)


The content of this website is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
ISSN 5249-5925 (online) | ISSN 2581-1037 (print)
Jl. Grafika No.2 Kampus UGM, Yogyakarta 55281
Email : jcef.ft@ugm.ac.id
Web Analytics JCEF Stats